📊 Panel Schedule Builder

← Back to SparkyStudy

Panel setup

Panel — click any slot to assign a breaker

Odd side (left)
#
Even side (right)

Phase balance

Phase A
0 A
Phase B
0 A
Phase C
0 A
Phases balanced.

Load summary

Connected (heaviest phase)
0 A
Main breaker
0 A
This planner shows connected load per phase so you can practise balancing. It does not calculate demand load or size a service or feeder — that follows the Code’s demand rules for the type of occupancy, which this simple planner doesn’t model. Educational use only.
⚡ Teaching tool. Simplified — doesn't apply feeder demand factors per NEC 220.42 / CEC 8-200 tables (fixed, ranges, dryers, heating vs cooling, receptacle demand). Real panel schedules must include neutral loading, largest motor 125% rule (NEC 430.24), continuous-load 125% (NEC 210.19), and specific load-type demand factors. Verify with your code book and a qualified designer for real installations.